Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-3      15-41/(15-42 blank) (12) Install four screws (10) and locknuts (9) in spacer (11), LHS control box (8) and fender (12). (13) Tighten two locknuts (13) on screws (14). (14) Install LHS control box cover (7), four lockwashers (6) and screws (5) on LHS control box (8). (15) Install cushion clamp (3), washer (2) and self-tapping screw (1) on work lamp wiring harness (4). c. Follow-On  Maintenance: Install rubber fender edging, (TM 9-2320-364-20). Install left front mud flap, (TM 9-2320-364-20). Install left fender front and rear skirt, (TM 9-2320-364-20). Install work lamp, (TM 9-2320-364-20). Install left engine noise panel, (TM 9-2320-364-20). Install arctic kit battery box (if equipped), (TM 9-2320-364-20). Install battery box, (TM 9-2320-364-20). Install battery disconnect switch, (if equipped) (TM 9-2320-364-20). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business