TM 9-2320-364-34-3
16-46
16-3. BOOM ASSEMBLY REPAIR (CONT).
NOTE
Ensure equalizer link and
tube weldment clear rear of
outer-mid section.
If cable was tied to
equalizer link weldment, tie
must be removed.
(106)
With the aid of an assistant, hold equalizer
link (19) and push outer-mid section (40)
further into inner-mid section (20). Route
cable (34) end through hole in rear of
inner-mid section.
(107)
Position inner-mid section (20) over on
opposite side.
(108)
Position shims (43) and wear pad (44) on
inner-mid section (20).
At least 0.06 inches (1.5 mm) of
clearance required between
highest spot on fly section and
bottom of wear pads or section
may not operate properly and
damage to equipment may
result.
(109)
Check clearance between outer-mid
section (40) and wear pad (44). Add or
subtract shims (43) as required.
|