| |
TM 9-2320-364-34-3
16-95
e.
Installation.
(1)
Apply hydraulic oil to two preformed
packings (10).
(2)
Install two preformed packings (10) and
position hoist motor valve (9) on
motor (11).
Adhesives, solvents, and sealing
compounds can burn easily, can
give off harmful vapors, and are
harmful to skin and clothing. To
avoid injury or death, keep away
from open fire and use in well-
ventilated area. If adhesive,
solvent, or sealing compound
gets on skin or clothing, wash
immediately with soap and
water.
(3)
Apply sealing compound on threads of four
screws (7).
(4)
Install four lockwashers (2) and screws (7).
Tighten screws to 15 to 17 lb-ft (20 to 23
N.m).
(5)
Apply hydraulic oil to preformed packings
(3) and (4).
(6)
Install two preformed packings (3) and
preformed packing (4) and connect two
hoses (1) and hose (2) on two fittings (5)
and elbow (6).
f.
Follow-On Maintenance:
Fill hydraulic reservoir, (TM 9-2320-364-20).
Check operation, (TM 9-2320-364-10).
Check for oil leaks, (TM 9-2320-364-10).
Load test crane, (Para 16-32).
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
|