| |
TM 9-2320-364-34-3
16-110
16-15. HOIST CABLE FOLLOWER REPAIR (CONT).
c.
Assembly.
NOTE
Perform Steps (1) through (9)
only if cable follower assembly
was disassembled.
(1)
Install three bearings (37) in rollers (21),
(29), and (35).
(2)
Position roller (35) and two thrust washers
(34) on roller shaft (24).
(3)
Install bushing (32) in support plate (33).
(4)
Install bushing (32), thrust washer (30),
roller (29), thrust washer (28), end cap (27)
and screw (26) on roller shaft (24). Tighten
screw to 72 lb-in (8 N.m).
(5)
Install spring pin (32) in bushing (33) and
roller shaft (24).
(6)
Install bushing (25) in support plate (23).
(7)
Install bushing (25), thrust washer (22),
roller (21), thrust washer (20), end cap (19)
and screw (18) on roller shaft (24). Tighten
screw to 72 lb-in (8 N.m).
(8)
Install spring support tubes (17) on lever
arm feet (7) and (13) with two washers (16)
and screws (15). Tighten screws to 68 lb-ft
(92 N.m).
(9)
Install left spring holder (7), roller
assembly (8), spacer (9), block (10),
spacer (11), block (12), right spring
holder (13), two screws (14) and nuts (6).
Tighten screws to 16 lb-ft (22 N.m).
|