| |
TM 9-2320-364-34-3
16-167
(10)
Install swivel nut (7) on front of tension
load cell (8).
To avoid damage to load cell, use
care when lowering or raising
hoist assembly.
NOTE
Raise or lower lifting device to
allow hoist assembly to rotate
forward slightly to gain better
access to nuts during installation.
(11)
Position end cap (4), swivel nut (6) and jam
nut (5) on tension load cell (8).
(12)
Using feeler gage, adjust tension load
cell (8) to 0.12 in (3.1 mm) between end
cap (4) and hoist mount (22) by loosening
or tightening nut (7) until gap is obtained.
(13)
Install block (3) with screw (2) on end
cap (4). Tighten screw to 84 lb-in (9 N.m).
(14)
Tighten jam nut (5).
(15)
Remove lifting device from hoist
assembly (1).
c.
Follow-On Maintenance:
Install crane hoist cable, (TM 9-2320-364-20).
Perform crane load test, (Para 16-32).
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
|