Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Raise or lower lifting device
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-3      16-167 (10) Install swivel nut (7) on front of tension load cell (8). To avoid damage to load cell, use care when lowering or raising hoist assembly. NOTE Raise or lower lifting device to allow hoist assembly to rotate forward slightly to gain better access to nuts during installation. (11) Position end cap (4), swivel nut (6) and jam nut (5) on tension load cell (8). (12) Using feeler gage, adjust tension load cell (8) to 0.12 in (3.1 mm) between end cap (4) and hoist mount (22) by loosening or tightening nut (7) until gap is obtained. (13) Install block (3) with screw (2) on end cap (4).  Tighten screw to 84 lb-in (9 N.m). (14) Tighten jam nut (5). (15) Remove lifting device from hoist assembly (1). c. Follow-On  Maintenance: Install crane hoist cable, (TM 9-2320-364-20). Perform crane load test, (Para 16-32). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business