Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: e. Installation
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-3 16-188 16-26.  FOUR FUNCTION CONTROL VALVE BANK REPAIR (CONT). e. Installation. Four valve control valve bank weighs 75 lbs (34 kg).  Attach suitable lifting device prior to installation to prevent possible injury to personnel. (1) Attach lifting device to four valve control valve bank (27). (2) Position four function control valve bank (27) loosely between left and right mounting brackets (17) and (18). (3) Apply hydraulic oil to preformed packing (36). (4) Install preformed packing (36) and hose (35) on four function control valve bank (27).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business