| |
TM 9-2320-364-34-3
16-191
(12)
Install cover (13) with four screws (16),
washers (14), washers (12), lockwashers
and nuts (10). Tighten nuts to 84 lb-in
(9 N.m).
NOTE
Perform Step (13) if data plate
was removed.
(13)
Install data plate (8) with four rivets (9).
(14)
Apply hydraulic oil to preformed
packing (6).
(15)
Install preformed packing (6) hose (5) on
bulkhead fitting (7).
(16)
Apply hydraulic oil to preformed
packing (3).
(17)
Install preformed packing (3) and drain
supply line hose (2) on bulkhead fitting (4).
f.
Follow-On Maintenance:
Connect batteries, (TM 9-2320-364-20).
Start engine and check for oil leaks,
(TM 9-2320-364-10).
Shut off engine, (TM 9-2320-364-10).
Check hydraulic fluid level,
(TM 9-2320-364-20).
Load test crane, (Para 16-32).
Stow crane, (TM 9-2320-364-10).
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
|