| |
TM 9-2320-364-34-3
16-200
16-28. TWO FUNCTION CONTROL VALVE BANK REPAIR (CONT).
(3)
Remove four nuts (7), lockwashers (8),
washers (9), cover (10), washers (11) and
screws (12) from brackets (6) and (13).
Discard lockwashers.
The crane hydraulic system
operates at oil pressures up to
3,100 psi (21,375 kPa). Never
disconnect any hydraulic line or
fitting without first dropping the
pressure to zero. Failure to
comply may result in serious
injury or death to personnel.
NOTE
Tag and mark hoses prior to
removal.
Cap and plug hoses and
fittings after removal.
(4)
Remove two hoses (14), hoses (15) and four
preformed packings (16) from fittings (17).
Discard preformed packings.
(5)
Remove hose (18) and preformed
packing (19) from fitting (20). Discard
preformed packing.
(6)
Remove hose (21) and preformed
packing (22) from elbow (23). Discard
preformed packing.
(7)
Remove hose (24) and preformed
packing (25) from elbow (26). Discard
preformed packing.
|