| |
TM 9-2320-364-34-3
16-250
Materials/Parts
Cloth, Cleaning (Item 11, Appendix B)
Grease (Item 22, Appendix B)
Solvent, Drycleaning (Item 69, Appendix B)
Locknut (2) (Item 175, Appendix E)
Ring, Retaining (2) (Item 495, Appendix E)
Seal (4) (Item 573, Appendix E)
This task covers:
a. Removal
c. Cleaning/Inspection
e. Installation
b. Disassembly
d. Assembly
f. Follow-On Maintenance
INITIAL SETUP
Equipment Condition
Engine OFF, (TM 9-2320-364-10)
Wheels chocked, (TM 9-2320-364-10)
LHS hook removed, (Para 16-38)
LHS hook arm cylinders removed, (Para 17-12)
References
TC 9-237
Tools and Special Tools
Tool Kit, General Mechanics
(Item 240, Appendix F)
Gloves, Chemical Oil Protective
(Item 81, Appendix F)
Goggles, Industrial (Item 83, Appendix F)
Pliers, Retaining Ring (Item 153, Appendix F)
Wrench, Combination 2-1/8 in.
(Item 266, Appendix F)
LHS Bushing Remover (Appendix C)
LHS Bushing Remover/Installer (Large)
(Appendix C)
LHS Bushing Remover/Installer (Small)
(Appendix C)
LHS Lead Screw (Appendix C)
LHS Washer (Appendix C)
Lifting Device, Minimum Capacity 1100 lbs
(499 kg)
16-39. LOAD HANDLING SYSTEM (LHS) HOOK ARM REPAIR.
a.
Removal.
(1)
Install pivot pin (1), washer (2) and snapper pin (3) in hook arm (4).
|