| |
TM 9-2320-364-34-3
16-298
This task covers:
a. Removal
b. Cleaning/Inspection
c. Installation
d. Follow-On Maintenance
INITIAL SETUP
Materials/Parts
Grease (Item 22, Appendix B)
Sealing Compound (Item 58, Appendix B)
Solvent, Drycleaning (Item 69, Appendix B)
Equipment Condition
Pivot removed, (TM 9-2320-364-20)
Tools and Special Tools
Tool Kit, General Mechanics
(Item 240, Appendix F)
Compressor Unit, Air (Item 35, Appendix F)
Gloves, Chemical Oil Protective
(Item 81, Appendix F)
Goggles, Industrial (Item 83, Appendix F)
Press, 60 Ton (Item 164, Appendix F)
LHS Bushing Remover (Appendix C)
LHS Bushing Remover/Installer (Small)
(Appendix C)
LHS Bushing Remover/Installer (Large)
(Appendix C)
LHS Lead Screw (Appendix C)
LHS Washer (Appendix C)
16-44. CONTAINER HANDLING UNIT (CHU) PIVOT REPAIR.
a.
Removal
NOTE
Left side and right side pivots are identical. Right side is shown.
(1)
Using removal/installation tool (six pieces), remove bushing (1) from slider pivot (2).
1
2
REMOVAL/INSTALLATION TOOL
|