| |
TM 9-2320-364-34-3
17-36
17-5. MAIN HYDRAULIC SYSTEM ADJUSTMENT (CONT).
(5)
Disconnect hose 2295 (5) and remove preformed packing (6) from port G8 on multifunction manifold
(7). Discard preformed packing.
(6)
Install metal cap on port G8.
(7)
Apply hydraulic oil to preformed packing (6).
(8)
Position preformed packing (6) on adapter.
(9)
Install adapter and test fitting on hose 2295 (5).
(10)
Install long test hose between test fittings.
(11)
Set selector on flowmeter to LO FLOW.
(12)
Turn handle on loading valve to the left and open loading valve on flowmeter fully.
(13)
Start engine (TM 9-2320-364-10).
Do not allow loading valve to remain closed longer than 10 seconds or damage to
equipment may result.
(14)
Turn handle on loading valve to the right and slowly close loading valve on flowmeter.
(a)
If 3,675 psi +75 50 psi (25,339 kPa +517, 345 kPa) are not present on flowmeter pressure gage
when flow drops to 0 gpm (0 lpm), go to Step (15).
(b)
If 3,675 psi +75 50 psi (25,339 kPa +517, 345 kPa) are present on flowmeter pressure gage when
flow drops to 0 gpm (0 lpm), main hydraulic pump control adjustment is OK, go to Step (21).
(15)
Shut OFF engine (TM 9-2320-364-10).
|