TM 9-2320-364-34-3
17-41
b.
Installation.
Preformed packing, backup ring
and sealing ring assembly are
very similar in size. The last
preformed packing to be
installed and its backup ring are
the smallest in size. If these
components fit loosely or tightly
on load control valve, they are
installed in the incorrect
position. Damage to equipment
may result.
(1)
Apply hydraulic oil to preformed
packings (9), (12) and (13) and backup
rings (11) and (10).
(2)
Install preformed packing (13), preformed
packing (12), two backup rings (11), backup
ring (10) and preformed packing (9) on load
control valve (7).
(3)
Install load control valve (7) in hydraulic
manifold (8). Tighten valve to 75 lb-ft
(102 N.m).
(4)
Install LHS main junction box cover (5) on
LHS main junction box (6) with four
lockwashers (4) and screws (3).
(5)
Connect two hose quick disconnects (1) on
main control box quick disconnects (2).
c.
Follow-On Maintenance:
Start engine, (TM 9-2320-364-10).
Operate LHS, (TM 9-2320-364-10).
Check for oil leaks, (TM 9-2320-364-10).
Shut OFF engine, (TM 9-2320-364-10).
Check hydraulic oil reservoir level,
(TM 9-2320-364-20).
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
|