Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: b. Installation
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-3 17-46      17-8.  LOAD HANDLING SYSTEM (LHS) MAIN MANIFOLD RELIEF VALVE   REPLACEMENT (CONT). (6) With the aid of an assistant, push on top of LHS main junction box (6) towards front of truck enough to lift rear of LHS main junction box (6) approximately two in. (5.08 cm), and place two wooden blocks under LHS main junction box (6). (7) Position drain pan under relief valve (15). (8) Remove relief valve (15) from manifold (16). (9) Remove two backup rings (17), preformed packing (18), two backup rings (19), preformed packing (20) and preformed packing (21) from relief valve (15).  Discard backup rings and preformed packings. b. Installation. (1) Apply hydraulic oil to preformed packings (20) and (21) and two backup rings (17) and (19). (2) Install preformed packing (21), preformed packing (20), two backup rings (19), preformed packing (18) and two backup rings (17) on relief valve (15).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business