| |
TM 9-2320-364-34-3
18-16
18-2. ENGINE ARCTIC KIT INSTALLATION (CONT).
(91)
Remove and discard plug (100) from ECB (86).
(92)
Install 24V receptacle (101) and wire 1435 (102) to ECB (86) with nut (103).
NOTE
Install cable ties as required.
(93)
Install wire 1340 (104) on 24V receptacle (101) with screw (105).
(94)
Connect MC 101 connector (106).
(95)
Install heater control panel (87) to heater
compartment (83) with four screws (36).
(96)
Install ECB covers (84) and (85) with 15
screws (36).
(97)
Install heater control access panel (83) with
eight screws (36).
|