| |
TM 9-2320-364-34-3
18-102
18-9. INTERFACE KIT INSTALLATION (CONT).
(33)
Drill 13/32 in. (10 mm) hole in step support (51) as shown.
(34)
Install bracket (52) to step support (51) with screw (53) and locknut (54).
(35)
Position two cushion clips (55) on hose 2810 (34) and hose 2724 (36).
(36)
Install two cushion clips (55) on bracket (52) with two screws (56) and locknuts (57).
(37)
Apply hydraulic oil to preformed packing (58).
(38)
Install hose 2810 (34) and preformed packing (58) on fitting (59) in valve (16).
2 1/2 IN.
6.35 CM
59
58
34
16
54
51
53
55
52
57
55
34
36
56
1 1/2 IN.
3.81 CM
|