Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: b. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-3 18-118 18-9.  INTERFACE KIT INSTALLATION (CONT). (113) Install jumper wire (165) between terminal 1 (166) and terminal 5 (167) of S4 connector (168). Ensure all wires and hoses are away from moving parts and are not rubbing or making contact with metal parts.  Failure to comply may result in damage to equipment. (114) Install cable ties to all hoses and wires as required. b. Follow-On  Maintenance: Fill hydraulic system, (TM 9-2320-364-20). Install heater compartment cover, (TM 9-2320-364-20). Install left front noise panel, (TM 9-2320-364-20). Install left side noise panel, (TM 9-2320-364-20). Install rear noise panel, (TM 9-2320-364-20). Connect batteries, (TM 9-2320-364-20). Install fire extinguisher, (TM 9-2320-364-10). Stow LHS, (TM 9-2320-364-10). Check for leaks, (TM 9-2320-364-10). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK 166 165 167 168

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business