| |
TM 9-2320-364-34-3
18-172
18-13. CONTAINER HANDLING UNIT (CHU) KIT INSTALLATION (CONT).
(151)
Apply light coat of grease to outer surface
of slider pivot pin (187), spacer (188) and
retaining ring (189) and thrust washer, seals
and bore on right arm assembly (158).
Use care when removing snap
and retaining rings. Snap and
retaining rings are under spring
tension and can act as projectiles
when released and could cause
severe eye injury.
NOTE
Ensure retaining ring is fully
seated after installation.
(152)
With the aid of an assistant, position right
slider assembly (186) and install slider
pivot (187) in right arm assembly (158)
with spacer (188) and retaining ring (189).
(153)
Remove lifting device from right slider
assembly (186).
(154)
Check that pivot lock pin (190) properly
locks into handle (191).
NOTE
If pivot lock pin properly locks
into handle go to Step (160).
(155)
Remove four screws (192), shim(s) (193)
(if present) and handle (191) from right
arm assembly (158).
(156)
Remove or add shim(s) (193) to right arm
assembly (158) as required.
187
186
188
189
158
190
191
192
193
158
191
|