| |
TM 9-2320-364-34-4
20-284
Materials/Parts
Oil, Lubricating (Item 36, Appendix B)
This task covers:
a. Installation
b. Follow-On Maintenance
INITIAL SETUP
Equipment Condition
Engine oil filter and spin-on adapter housing
installed, (Para 20-84)
Tools and Special Tools
Tool Kit, General Mechanics
(Item 240, Appendix F)
Goggles, Industrial (Item 83, Appendix F)
Hammer, Hand, Soft Plastic
(Item 88, Appendix F)
Indicator, Dial, Set w/Magnetic Base
(Item 98, Appendix F)
Pliers, Retaining Ring (Item 157, Appendix F)
Wrench, Torque (0 to 175 lb-ft [0-237 N.m])
(Item 277, Appendix F)
Screw (5/16-18 in. by 2 in.)
20-85. WATER PUMP ASSEMBLY INSTALLATION.
Materials/Parts
Sealing Compound (Item 56, Appendix B)
Gasket (Item 71, Appendix E)
Lockwasher (3) (Item 285, Appendix E)
Packing, Preformed (Item 366, Appendix E)
Ring, Seal (Item 508, Appendix E)
a.
Installation.
(1)
Apply lubricating oil to seal ring (14) and
install on water pump (9).
(2)
Position water pump (9) on front balance
cover (13).
(3)
Install washer (12), lockwasher (11) and
screw (10) on front balance cover (13) and
water pump (9). Tighten screw 45 to
50 lb-ft (61 to 68 N.m).
(4)
Install two lockwashers (8) and screws (7)
on water pump (9) and front balance
cover (13). Tighten 45 to 50 lb-ft
(61 to 68 N.m).
|