Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: d. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-4      20-309 NOTE Flat side of injector gage faces injector follower. Some supply brake wire harness connectors may have to be removed to adjust fuel injector timing. (2) Insert 1.520 in. (38.608 mm) injector gage in hole at top of fuel injector body (11). (3) Hold injector rocker arm push rod (12) and loosen locknut (13). (4) Turn push rod (12) and adjust injector rocker arm (14) so flat side of injector gage passes just over top of injector follower (15). (5) Hold push rod (12) and tighten locknut (13). (6) Put injector gage into fuel injector body (11) and recheck clearance of injector follower (15).  If clearance is not correct repeat Steps (2) through (5). (7) Repeat Steps (1) through (6) for other seven fuel injectors. d. Follow-On  Maintenance: Install blower assembly, (Para 20-95). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business