| |
TM 9-2320-364-34-4
23-67
Collector ring installer tool
should be supported on wooden
blocks in press to allow forward
clutch and turbine shaft assembly
to rest fully supported with shaft
down or damage to parts may
occur.
(3)
Position collector ring installer tool on
wooden blocks in press.
(4)
Position forward clutch and turbine shaft
assembly (6) and collector ring installer tool
down in press shaft.
(5)
Remove large inner retaining ring (8) from
fifth clutch driving hub (9).
When removing fifth clutch
driving hub, ensure clutch plates
do not stick to bottom of hub.
Failure to comply may result in
clutch plates falling and damage
to equipment may result.
(6)
Remove fifth clutch driving hub (9) from
forward clutch and turbine shaft
assembly (6).
(7)
Remove forward clutch driving hub (10),
inner race (11), bearing (12), and outer
race (13) from forward clutch and turbine
shaft assembly (6).
NOTE
Make sure external-tanged plates
and internal-splined plates are
tied together and tagged in order
of removal.
(8)
Remove five external-tanged plates (14) and
five internal-splined plates (15) from
forward clutch and turbine shaft
assembly (6).
|