| |
TM 9-2320-364-34-4
25-9
NOTE
Perform Step (c) only if fittings
are damaged or new air chamber
is being installed.
(c)
Remove two fittings (3) and (4) from
air brake chamber (6).
(d)
Remove air brake chamber (6) from
brake assembly (7).
(e)
Remove wedge assembly (8) from
brake assembly (7).
NOTE
Perform Step (f) only if collet nut is damaged.
(f)
Remove collet nut (5) from air brake chamber (6).
Table 25-1. Air Line Numbers
Axle No. 1
Axle No. 2
Right Side
Left Side
Right Side
Left Side
2874
2874
2874
2874
2013
2012
2387
2388
2874
2874
2874
2874
(2)
Installation.
(a)
Coat wedge assembly (8) with grease.
(b)
Install wedge assembly (8) in brake assembly (7).
NOTE
Perform Step (c) only if collet nut was removed.
(c)
Install collet nut (5) onto air brake chamber (6) until threads on air brake chamber run out.
|