TM 9-2320-364-34-4
25-13
Materials/Parts
Grease (Item 23, Appendix B)
Sealing Compound (Item 52, Appendix B)
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Personnel Required
Two
Equipment Condition
Brake drum removed, (Para 25-3)
Tools and Special Tools
Tool Kit, General Mechanics
(Item 240, Appendix F)
Wrench, Spanner (Item 275, Appendix F)
Wrench, Torque (0 to 600 lb-ft [0-814 N.m])
(Item 278, Appendix F)
25-5. AXLE NO. 5 AIR BRAKE CHAMBER REPLACEMENT.
Materials/Parts - Continued
Sealing Compound (Item 53, Appendix B)
Tag, Identification (Item 72, Appendix B)
a.
Removal.
NOTE
Left and right air brake chambers are removed the same way. The left side is shown.
Tag and mark air lines before removal.
Note position of fittings prior to removal.
Note position of air brake chamber prior to removal.
(1)
Remove air line 2874 (1) from elbow (2)
and tee (3).
NOTE
Perform Step (2) for left side
and Step (3) for right side.
(2)
Remove air lines 2141 (4), 2016 (5) and
2874 (6) from elbows (7) and (8) and tee (3).
(3)
Remove air lines 2140 (4), 2018 (5) and
2874 (6) from elbows (7) and (8) and tee (3).
NOTE
Perform Step (4) if elbows or tee
are changed, or if a new air brake
chamber is being installed.
(4)
Remove elbows (2), (7) and (8) and tee (3)
from air brake chamber (9).
|