Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: f. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-4 25-26      25-7.  AXLE NO. 1, 2 AND 5 WHEEL HUB ASSEMBLY REPAIR (CONT). (7) Position lockwasher (4) on pivot and spindle assembly (6). (8) With the aid of an assistant and using socket, install spindle nut (5) on pivot and spindle assembly (6). Tighten spindle nut to 247 lb-ft to 290 lb-ft (335-393 N.m). (9) Remove wheel nuts (2) from studs (3). (10) Remove lifting device from wheel hub assembly (1). (11) Rotate wheel hub assembly (1) while tapping on wheel hub assembly with soft face hammer, until wheel hub assembly is fully seated. (12) With the aid of an assistant, recheck tightness of spindle nut (5) on pivot and spindle assembly (6) and tighten to 247 lb-ft to 290 lb-ft (335-393 N.m). (13) With the aid of an assistant, use socket to unscrew spindle nut (5) a minimum of 1/16 of a turn or until two locking tabs of lockwasher (4) are aligned with cutouts of spindle nut. (14) Bend two locking tabs of lockwasher (4) into cut outs on spindle nut (5). f. Follow-On  Maintenance: Install planetary hub gear, (Para 25-6). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business