| |
TM 9-2320-364-34-4
25-30
Materials/Parts
Solvent, Drycleaning (Item 68, Appendix B)
Locknut (2) (Item 194, Appendix E)
Pin, Cotter (2) (Item 424, Appendix E)
This task covers:
a. Removal
c. Cleaning/Inspection
e. Installation
b. Disassembly
d. Assembly
f. Follow-On Maintenance
INITIAL SETUP
Equipment Condition
Brake assembly removed, (Para 25-8)
Tools and Special Tools
Tool Kit, General Mechanics
(Item 240, Appendix F)
Compressor Unit, Air (Item 35, Appendix F)
Gloves, Chemical Oil Protective
(Item 81, Appendix F)
Goggles, Industrial (Item 83, Appendix F)
Gun, Airblow (Item 86, Appendix F)
Multiplier, Torque (Item 141, Appendix F)
Tape, Measuring (Item 235, Appendix F)
Wrench, Combination 1-5/16 in.
(Item 257, Appendix F)
Wrench, Torque (0 to 175 lb-ft [0-237 N.m])
(Item 277, Appendix F)
25-9. AXLE NO. 1, 2 AND 5 TIE ROD REPAIR.
a.
Removal.
(1)
Remove cotter pin (1) and castle nut (2)
from each tie rod end (3). Discard cotter
pin.
NOTE
Tie rod can only be installed one
way. Note position of tie rod
ends before removal.
(2)
Remove tie rod ends (3) from steering
swivel arms (4).
|