| |
TM 9-2320-364-34-4
25-103
Materials/Parts
Oil, Lubricating (Item 36, Appendix B)
Sealing Compound (Item 53, Appendix B)
Packing, Preformed (Item 399, Appendix E)
This task covers:
a. Caging air brake chamber
c. Installation
e. Follow-On Maintenance
b. Removal
d. Uncaging air brake chamber
INITIAL SETUP
Personnel Required
Two
Equipment Condition
Axle on stand, (Para 25-2)
Tools and Special Tools
Tool Kit, General Mechanics
(Item 240, Appendix F)
Stand, Maintenance, Axle
(Item 225, Appendix F)
Wrench, Torque (0 to 175 lb-ft [0-237 N.m])
(Item 277, Appendix F)
Lifting Device, Minimum Capacity 132 lbs
(60 kg)
25-17. AXLE NO. 3 AND 4 BRAKE DRUM REPLACEMENT.
a.
Caging air brake chamber.
(1)
Remove nut (1), washer (2) and caging bolt (3) from storage slot of air brake chamber (4).
(2)
Remove plug (5) and preformed packing (6) from air brake chamber (4). Discard preformed packing.
|