| |
TM 9-2320-364-34-4
25-192
25-29. AXLE NO. 4 DIFFERENTIAL ASSEMBLY REPAIR (CONT).
(11)
Install adjusting shim (47) on pinion
shaft (3).
(12)
Install driven gear (43) in housing
assembly (15).
(13)
Install pinion shaft (3) in housing
assembly (15).
(14)
Install adjusting shim (45) on pinion
shaft (3).
(15)
With the aid of an assistant, hold pinion
shaft (3) in place and install taper
bearing (44) on pinion shaft.
(16)
Position jet extractor between gear teeth of
pinion shaft (3) and install adjusting
nut (42). Tighten nut to 543 to 572 lb-ft
(736 to 776 N.m).
(17)
Using a torque wrench, check preload of
pinion shaft (3). Preload must be 3 to 4
lb-ft (4 to 5 N.m).
NOTE
If preload is correct, go on
to Step (18).
If preload is incorrect,
repeat Steps (1) through
(17) until proper preload is
obtained.
(18)
Stake adjusting nut (42) in two places.
|