| |
TM 9-2320-364-34-4
28-2
Section II. MATERIAL HANDLING CRANE MAINTENANCE
Materials/Parts
Grease (Item 22, Appendix B)
Oil, Hydraulic (Item 34, Appendix B)
Sealing Compound (Item 56, Appendix B)
Solvent, Drycleaning (Item 68, Appendix B)
Packing, Preformed (Item 336, Appendix E)
Packing, Preformed (Item 347, Appendix E)
Packing, Preformed (Item 389, Appendix E)
Repair Kit (2) (Item 461, Appendix E)
Repair Kit (Item 469, Appendix E)
This task covers:
a. Disassembly
b. Cleaning/Inspection
c. Assembly
INITIAL SETUP
Personnel Required
Two
Equipment Condition
Erection cylinder on clean work surface
Tools and Special Tools
Tool Kit, General Mechanics
(Item 240, Appendix F)
Caps, Vise Jaw (Item 27, Appendix F)
Compressor Unit, Air (Item 35 Appendix F)
Gage Set, Telescoping (Item 69, Appendix F)
Gloves, Chemical Oil Protective
(Item 81 , Appendix F)
Goggles, Industrial (Item 83, Appendix F)
Gun, Airblow (Item 86, Appendix F)
Micrometer, Outside, Caliper, Set
(Item 139, Appendix F)
Pan, Drain 6 gal (Item 145, Appendix F)
Press, 60 Ton (Item 164, Appendix F)
Vise, Machinists (Item 248, Appendix F)
Vise, Pipe, Chain (Item 249, Appendix F)
Wrench, Combination 1-1/8 in.
(Item 255, Appendix F)
Wrench, Torque (0-175 lb-ft [0-237 N.m])
(Item 277, Appendix F)
Wooden Blocks (2) (Appendix C)
28-2. ERECTION CYLINDER REPAIR.
|