Click here to make tpub.com your Home Page

Page Title: Stacking/Loading (Normal). (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-3990-206-14&P
2-11. FLATRACK STACKING AND LOADING ON PLS (CONT).
(17)
Install pin (13) to secure lock (14) in place.
(18)
Remove three lifting straps (5) from five tiedown rings (7), (9) and (10) on flatrack (8).
(19)
Repeat Steps (1) through (18) for additional flatracks being stacked.
(20)
Stow three lifting straps (5) in flatrack stowage box (6).
Ensure LHS hook is hooked only in flatrack located on bottom of stack. Failure to comply
will result in improper loading of flatrack stack and damage will occur to equipment.
(21) Position PLS truck in front of flatracks (8) and (12) and use Load Handling System (LHS) to load
flatracks on truck (TM 9-2320-364-10).
2-16

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business