|
|
![]() TM 9-3990-206-14&P
3-2. ROLLER REPLACEMENT (CONT).
(2)
Support roller (3) and remove two retaining pins (2). Remove roller (3) from flatrack.
(3)
Position roller (3) on roller stowage bracket (4) and install two retaining pins (2).
(4)
Install two holding pins (1) in retaining pins (2).
b.
Installation.
(1)
Remove two holding pins (1) from retaining pins (2).
(2)
Support roller (3) and remove two retaining pins (2) and roller (3) from roller stowage bracket (4).
(3)
Install roller (3) on flatrack using two retaining pins (2).
(4)
Install two holding pins (1) in retaining pins (2).
c.
Follow-On Maintenance:
Unload flatrack, (TM 9-2320-364-10).
4
END OF TASK
1
3
2
3-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |