|
|
TM 9-3990-206-14&P
b.
Disassembly.
(1)
Drill out seven rivets (1) and remove
3
1
2
4
stowage box door (2) from hinge (3).
Discard rivets.
(2)
Drill out seven rivets (1) and remove
hinge (3) from stowage box (4). Discard
rivets.
c.
Cleaning/Inspection.
(1)
Inspect latch, lid and inside of stowage
box (4) for dirt and debris, and clean all
components with water, detergent and
stiff-bristled brush.
(2)
Inspect all weldments for cracks or other
damage.
4
(3)
Inspect that drain holes are open.
d.
Assembly.
5
(1)
Install hinge (3) on stowage box (4) with
seven rivets (1).
(2)
Install stowage box door (2) on hinge (3)
with seven rivets (1).
2
1
Installation. With the aid of an assistant,
e.
3
install stowage box (4) on front wall (5) and
studs (3) with four washers (2) and locknuts (1).
f.
Follow-On Maintenance:
Load flatrack on truck or trailer,
(TM 9-2320-364-10).
END OF TASK
9-31
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |