|
|
TM 9-3990-206-14&P
2
4
(3)
Remove mud flap (2) from lower clip (3)
and install in upper clip (4).
(4)
Remove and discard two cotter pins (5)
from pin (6).
7
(5)
Slide pin (6) out from clevis (7) and remove
chain (8) from clevis.
3
(6)
Repeat Steps (3) through (5) for other pin
assembly.
5
6
8
(7)
Using lifting device, lower wall (1).
LIFTING DEVICE
1
NOTE
If removing rear pin assembly,
2
4
Perform Step (8). If removing
front pin assembly, go on to
Step (9).
10
(8)
Remove mud flap (2) from lower clip (3)
12
and install in upper clip (4).
(9)
Slide pin (9) towards outside of wall (1).
(10)
Lift safety catch (10) and collar (11) and
turn adjusting nut (12) clockwise until tube
assembly (13) separates from pin (9).
13
1
11
9
3
9-49
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |