Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-3990-206-14&P
9-21. PIN ASSEMBLY AND BRACKET REPAIR (CONT).
LIFTING DEVICE
Front wall weighs 1,500 lbs
(681 kg). Rear wall weighs
1,200 (545 kg). Do not stand
under walls when raising or
lowering. Use the aid of a
1
lifting device when raising or
lowering the front or rear wall
to prevent serious injury or
death to personnel.
Lifting device must remain on
wall. Lifting device is
providing all the support for
the wall. Failure to comply
will result in wall falling
causing serious injury or death
to personnel.
NOTE
2
4
If installing front pin assembly,
perform Step (9). If installing rear
pin assembly, go on to Step (11).
(9)
Using lifting device, raise wall (1) to full
upright position.
7
(10)
Slide pin (6) out and install chain (8) on
clevis (7) with pin and two cotter pins (5).
3
(11)
Remove mud flap (2) from upper clip (4)
5
6
and install in lower clip (3).
8
(12)
Tighten two screws (14) on side of wall (1).
(13)
Repeat Steps (10) through (12) for
LIFTING DEVICE
remaining pin assembly.
(14)
Remove lifting device from wall (1).
(15)
With the aid of an assistant, lower wall (1).
1
f.
Follow-On Maintenance:
Install pin lock assembly, (Para 9-24).
Lubricate pins, (Appendix K)
14
END OF TASK
9-56

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business