|
|
TM 9-3990-206-14&P
10-7. WALL REPLACEMENT (CONT).
c.
Follow-On Maintenance:
Install mud flaps, (Para 9-22).
Install stowage boxes, (Para 9-16) (front wall only).
Install rear pin assemblies and brackets, (Para 9-21) (for rear wall replacement only).
Install front pin assemblies and brackets, (Para 9-21) (for front wall replacement only).
Install tiedown rings, (Para 9-19) (wall tiedown rings only).
END OF TASK
10-14
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |