Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 1. MAIN FRAME DOES NOT UNLOAD
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-4 2-3140 1.  MAIN FRAME DOES NOT UNLOAD. INITIAL SETUP 1. Fault is within LHS system.  Go to Load Handling System (LHS) Troubleshooting. START YES NO None KNOWN INFO POSSIBLE PROBLEMS TEST OPTIONS REASON FOR QUESTION Jumper harness test. Main frame unload solenoid is powered by wire 1465. If wire 1465 is open where it passes through control box, the main frame unload function will not operate. 2-38. CHU TROUBLESHOOTING (CONT) Tools and Special Tools Tool Kit, General Mechanic’s:  Automotive (Item 74, Appendix G) Equipment Condition Engine OFF, (TM 9-2320-364-10) Parking brake ON, (TM 9-2320-364-10) Wheels chocked, (TM 9-2320-364-10) Air system charged, (TM 9-2320-364-10) Load handling system (LHS) fully extended, (TM 9-2320-364-10) References TM 9-2320-364-10 Does main frame unload properly when hooked directly to LHS control box? Replace CHU control box wiring (Para 21-22). LHS system faulty. CHU electrical system faulty.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business