Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance:
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2330-385-14
(6)
While holding adjustment screw (4), loosen
jam nut (5) on safety valve (6).
(7)
Apply sealing compound to threads of valve
(6) and install on elbow (7).
NOTE
If safety valve can not be
adjusted to release at 53-56 psi
(365-386 kPa) or 95-100 psi
(655-689 kPa) if equipped with
drawbar extension, replace valve.
(8)
Repeat Steps (3) through (7) until safety
valve releases at 53-56 psi (365-386 kPa) or
95-100 psi (655-689 kPa) if equipped with
drawbar extension.
(9)
Drain trailer air system, (Para 2-21).
(10)
Disconnect 0-160 psi (0-1103 kPa) pressure
gage from air hose 2224 (1) and adapter
(2).
(11)
Install air hose 2224 (1) to adapter (2).
Follow-On Maintenance:
d.
Charge air system, (Para 2-22).
Check for air leaks, (Para 4-7).
Remove wheel chocks, (Para 2-20).
END OF TASK
4-483

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business