Quantcast Follow-On Maintenance: -725550817

 

Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance:
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Adjustment. -725550816
Up
TM-9-2330-385-14 Palletized Load System Trailer (PLST) Model M1076 Manual
Next
INVERSION VALVE REPLACEMENT.
TM 9-2330-385-14
(6)
While holding adjustment screw (4), loosen
jam nut (5) on safety valve (6).
(7)
Apply sealing compound to threads of valve
(6) and install on elbow (7).
NOTE
If safety valve can not be
adjusted to release at 53-56 psi
(365-386 kPa) or 95-100 psi
(655-689 kPa) if equipped with
drawbar extension, replace valve.
(8)
Repeat Steps (3) through (7) until safety
valve releases at 53-56 psi (365-386 kPa) or
95-100 psi (655-689 kPa) if equipped with
drawbar extension.
(9)
Drain trailer air system, (Para 2-21).
(10)
Disconnect 0-160 psi (0-1103 kPa) pressure
gage from air hose 2224 (1) and adapter
(2).
(11)
Install air hose 2224 (1) to adapter (2).
Follow-On Maintenance:
d.
Charge air system, (Para 2-22).
Check for air leaks, (Para 4-7).
Remove wheel chocks, (Para 2-20).
END OF TASK
4-483

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +