|
|
TB 9-2320-279-13&P-2
DOOR BALLISTIC GLASS AND FRAME ASSEMBLY REPLACEMENT - CONTINUED
0014 00
CLEANING AND INSPECTION
INSTALLATION
1.
Install two ramps (25), four screws (24), washers (32), and new locknuts (31) on door (40).
2.
Install guide (43), spacer (42), capscrew (41), washer (46), and new locknut (45) on support (44).
3.
Install four ramps (20), eight screws (21), washers (19), and new locknuts (18) on retainer (17).
4.
Install doubler (49), handle (52), two washers (51), and capscrews (50) on support (44).
5.
Install washer (48) and bolt (47) on support (44).
6.
Install doubler (23), three washers (27), and bolts (26) on support (22).
WARNING
Use caution when handling heavy parts. Provide adequate support and use assistance during procedure.
Keep clear of heavy parts supported only by lifting device. Failure to follow this warning may cause injury
or death to personnel.
7.
With assistance, install support (44), support (22), retainer (17), three washers (16), bolts (15), washers (34), and new
locknuts (33) on door (40).
8.
Install washer (14), bolt (13), lift bracket (28), washer (30), and new locknut (29) on retainer (17).
9.
Install lift bracket (28), six washers (56), bolts (55), washers (36), and new locknuts (35) on door (40).
10.
Install two doublers (57), seven washers (12), bolts (11), washers (10), and new locknuts (9) on retainer (17).
11.
Install two sleeves (39), washers (54), capscrews (53), washers (38), and new locknuts (37) on door (40).
0014 00-5
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |