|
|
TB 9-2320-364-13&P-2
MAINTENANCE ALLOCATION CHART (MAC)
Table 1. MAC for the Crew Protection Kit.
(1)
(2)
(3)
(4)
(5)
(6)
MAINTENANCE LEVEL
FIELD
SUSTAINMENT
UNIT
DS
GS
DEPOT TOOLS AND
GROUP
COMPONENT/
MAINTENANCE
EQUIPMENT REMARKS
C
O
F
H
D
NUMBER
ASSEMBLY
FUNCTION
REF CODE
CODE
33
SPECIAL PURPOSE
KITS
3307
Crew Protection Kit Install
11.0
1,2,3,4,5,6,7,8,
9,10
Underbody Armor
Inspect
0.2
A
Install
2.0
6,8,9,10
Replace
1.0
6,8,9,10
Windshield Ballistic Inspect
0.2
A
Glass
Service
0.2
B
Install
1.0
2,8,10
Replace
1.0
2,8,10
Front Armor
Inspect
0.2
A
Install
1.5
6,8,9,10
Replace
1.5
6,8,9,10
Side Armor Panel Inspect
0.2
A
(LH and RH)
Install
1.5
6,8,9,10
Replace
1.0
6,8,9,10
Door Assembly
Inspect
0.2
A
Service
0.2
B
Install
1.0
8,9,10
Replace
1.0
8,9,10
Door Handle
Inspect
0.2
A
Assembly
Replace
1.0
7
Door Latch and Lock Inspect
0.2
A
Pin
Replace
1.0
7
Door Ballistic Glass Inspect
0.2
A
and Frame Assembly Service
0.2
B
Replace
2.0
7
Door Latch
Inspect
0.2
A
Adjustment
Service
0.2
Rear Cab Armor
Inspect
0.2
A
Install
2.0
2,6,8,9,10
Replace
2.0
2,6,8,9,10
Roof Armor
Inspect
0.2
A
Install
1.0
6,8,9,10
Replace
1.0
6,8,9,10
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |