• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
AIR CONDITIONER CHARGE/SERVICE. - Continued
LEFT SIDE NOISE PANEL PREPARATION/INSTALLATION.

Air Conditioning System Nsn 4120-01-526-9158 P/N 3528349 For Truck, Tractor M1074/M1075 Palletized Load System Page Navigation
  474    475    476    477    478  479  480    481    482    483    484  
img
TB 9-2320-364-13&P-1
NOTE
If system is extremely contaminated, install a receiver/dryer in-line as a prefilter for recovery/recycling
station.
6.
Connect recovery/recycling station flushing drain line (4) from inlet valve side of system to receiving
container (5).
7.
Turn on recovery/recycling station (6) and open inlet valve (7). Allow about 2 lbs. (1 kg)
of R-134A to flow through system.
8.
Close supply line valve (8) and wait for recovery/recycling station (6) to shut off.
9.
Disconnect recovery/recycling station flushing supply line (2) from outlet hose (3).
10. Disconnect recovery/recycling station flushing drain line (4) from inlet valve (7).
11. Purge system and check collection bottle for contaminants.
0055-66


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.