TB 9-2320-364-13&P-1
6. LEFT SIDE NOISE PANEL PREPARATION/INSTALLATION.
This task covers:
a. Left Side Noise Panel Preparation/Installation.
b. Follow-On Maintenance.
INITIAL SETUP
Models
Personnel Required
All
One
Test Equipment
References
None
None
Special Tools
Equipment Condition
None
None
Supplies
Special Environmental Conditions
Rubber Flap
None
Bracket
Restraint Bar
General Safety Instructions
(9) Screw - 1/4-20 x 1 in.
None
(4) Screw - 1/4-20 x 3/4 in.
(6) Locknut - 1/4 in.
(4) Washer - 1/4 in.
a.
Left Side Noise Panel
Preparation/Installation.
1.
Cut left side noise panel (1) as shown in
line art.
2.
File off rough edges on cut edge of left
side noise panel (1).
0055-67