• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
GENERAL PMCS PROCEDURES - CONTINUED
OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) - CONTINUED

Crew Protection Kit For M1074/M1075 Palletized Load System M1074P1 (Nsn 2320-01-523-1047) M1075P1 (Nsn 2320-01-523-1049) Page Navigation
  16    17    18    19    20  21  22    23    24    25    26  
img
. .
TB 9-2320-364-13&P-2
OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
0009 00
.
LOCATION
ITEM TO
CHECK/
ITEM
NOT FULLY MISSION
SERVICE
NO.
INTERVAL
PROCEDURE
CAPABLE IF:
N OT E
Perform PMCS for the M1074/M1075 Palletized Load System (PLS) Trac-
tor Truck in TM 9-2320-364-10 BEFORE performing PMCS for the Crew
Protection Kit.
Review all WARNINGs, CAUTIONs, and NOTEs before performing
PMCS and operating the vehicle with armor kit.
Perform all PMCS checks if:
a. You are the assigned operator but have not operated the vehicle with
armor kit since the last weekly checks.
b. You are operating the vehicle with armor kit for the first time.
Perform PMCS with vehicle parked on level ground, parking brake applied,
transmission in N (Neutral), wheels blocked, and engine shut down.
0009 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.