• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
WINDSHIELD BALLISTIC GLASS REPLACEMENT - CONTINUED
WINDSHIELD BALLISTIC GLASS REPLACEMENT - CONTINUED

Crew Protection Kit For M1074/M1075 Palletized Load System M1074P1 (Nsn 2320-01-523-1047) M1075P1 (Nsn 2320-01-523-1049) Page Navigation
  57    58    59    60    61  62  63    64    65    66    67  
img
TB 9-2320-364-13&P-2
WINDSHIELD BALLISTIC GLASS REPLACEMENT - CONTINUED
0017 00
INSTALLATION - CONTINUED
5.
Tighten locknuts (8, 15, and 17) to 108 lb in (12 Nm).
N OT E
Slide roof bracket rearward to ensure roof bracket is tight against front edge of roof.
6.
Install roof bracket (11), six washers (13), and new locknuts (12) on roof.
7.
Tighten five bolts (14) on underside of roof bracket (11).
10
11
8,9
12,13
7
14 (HIDDEN)
15,16
7
20
19
18
17
417-025
0017 00-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.