• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
UPPER BRUSH GUARD REPLACEMENT - CONTINUED
UPPER BRUSH GUARD REPLACEMENT - CONTINUED

Crew Protection Kit For M1074/M1075 Palletized Load System M1074P1 (Nsn 2320-01-523-1047) M1075P1 (Nsn 2320-01-523-1049) Page Navigation
  62    63    64    65    66  67  68    69    70    71    72  
img
TB 9-2320-364-13&P-2
UPPER BRUSH GUARD REPLACEMENT - CONTINUED
0018 00
INSTALLATION
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during proce-
dure. Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may cause injury or death to per-
sonnel.
N OT E
Upper brush guard weighs 147 lb (67 kg).
1.
Attach sling and lifting device to upper brush guard (3). Support upper brush guard as needed to allow installation of
stud plates (6).
2.
Install six stud plates (6) to upper brush guard (3) with six washers (5), bolts (4), washers (7), and new locknuts (8).
6
6
3
4
5
6
7
8
417-019
6
0018 00-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.