• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LOWER BRUSH GUARD REPLACEMENT - CONTINUED
LOWER BRUSH GUARD REPLACEMENT - CONTINUED

Crew Protection Kit For M1074/M1075 Palletized Load System M1074P1 (Nsn 2320-01-523-1047) M1075P1 (Nsn 2320-01-523-1049) Page Navigation
  66    67    68    69    70  71  72    73    74    75    76  
img
TB 9-2320-364-13&P-2
LOWER BRUSH GUARD REPLACEMENT - CONTINUED
0019 00
REMOVAL - CONTINUED
4.
Remove 12 locknuts (21), washers (20), and two gun mount covers (5) from upper brush guard (6) and lower brush
guard (3). Discard locknuts.
6
5
21
7
20
19
18 13
8
17
16 3
15
9
14
11 10
13
12
417-022
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during proce-
dure. Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may cause injury or death to per-
sonnel.
N OT E
Lower brush guard weighs 316 lb (143 kg).
5.
Attach two lifting links, sling, and lifting device to top edge of lower brush guard (3).
6.
Remove six locknuts (17) and washers (16) from top of lower brush guard (3).
7.
Using lifting device, remove remaining two bolts (19), washers (18), and lower brush guard (3) from front of vehicle.
0019 00-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.