CENTER BLAST DEFLECTOR REPLACEMENT - CONTINUED
CAB SIDE (REAR) ARMOR REPLACEMENT

Crew Protection Kit For M1074/M1075 Palletized Load System M1074P1 (Nsn 2320-01-523-1047) M1075P1 (Nsn 2320-01-523-1049) Page Navigation
  102    103    104    105    106  107  108    109    110    111    112  
img
TB 9-2320-364-13&P-2
CENTER BLAST DEFLECTOR REPLACEMENT - CONTINUED
0027 00
INSTALLATION - CONTINUED
8.
Swing torque rod up into position under center blast deflector (17).
9.
Install two bolts (16), washers (7), and nuts (6) on torque rod (15).
10.
Connect steering link rod (3) to pitman arm (2).
11.
Install bolt (1), washer (5), and nut (4) on pitman arm (2).
12.
Install electrical connector (10), two bolts (12), washers (13), and nuts (14) on bracket under center blast deflector (17).
13.
Install two hoses (8), nuts (9), and glad hands (11) on bracket under center blast deflector (17).
3
2
1
4,5
17
6,7
16
15
8
417-137
11
10
12,13,14
9
END OF WORK PACKAGE
0027 00-6