| |
TM 9-2320-364-10
2-92
Table 2-3. Operators Preventive Maintenance Checks
and Services (After) - CONT.
Location
Item
No.
Interval
Item to
Check/
Service
Procedure
Not Fully Mission
Capable if:
39
After
Load
Handling
System
(LHS)
Check LHS (1) for loose and
missing parts.
Parts are missing.
40
After
Load
Handling
System
(LHS)
Visually check hydraulic lines and
hoses (2), for leaks. Visually check
for cracked and kinked lines.
Class III leak is
evident. Cracks or
kinks that will
impair operation are
present.
|