Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: d. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-4      12-127 (26) Install two brackets (16) lockwashers (15), nuts (14), cushion clips (13) and locknuts (12) on bracket screws (17). (27) Install air line 2159 (10) on fitting (11) top of air reservoir (5). (28) Install air line 2002 (8) on fitting (9) on side of air reservoir (5). (29) Install air line 2184 (6) on elbow (7) on right side of air reservoir (5). (30) Install air lines 2994 (2) and 2993 (3) on tee (4) on right side of air reservoir (5). (31) Close front access cover (1). d. Follow-On Maintenance: Start engine, (TM 9-2320-364-10). Build up air pressure to 125 psi (861 kPa). Shut OFF engine, (TM 9-2320-364-10). Check air reservoir and fittings for air leaks, (TM 9-2320-364-10). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business