TM 9-2320-364-20-4
12-128
Materials/Parts
Sealing Compound (Item 77, Appendix C)
This task covers:
a. Removal
c. Installation
d. Follow-On Maintenance
b. Cleaning/Inspection
INITIAL SETUP
Personnel Required
Two
Equipment Condition
Engine OFF, (TM 9-2320-364-10)
Wheels chocked, (TM 9-2320-364-10)
Air system drained, (TM 9-2320-364-10)
Tools and Special Tools
Tool Kit, General Mechanics: Automotive
(Item 74, Appendix G)
Caps, Vise Jaw (Item 9, Appendix G)
Vise, Machinists (Item 75, Appendix G)
Wrench, Combination 1-1/16 in.
(Item 78, Appendix G)
Wrench, Combination 1-1/8 in.
(Item 79, Appendix G)
Wrench, Combination 1-3/8 in.
(Item 82, Appendix G)
12-28. AIR RESERVOIR NO. 2 REPLACEMENT.
Materials/Parts - Continued
Tags, Identification (Item 88, Appendix C)
Locknut (4) (Item 91, Appendix F)
Locknut (2) (Item 140, Appendix F)
Lockwasher (4) (Item 168, Appendix F)
a.
Removal.
Tag and mark air lines prior to removal.
(1)
Remove air lines 2007 (1) and 2184 (2) from two elbows (3).
(2)
Remove air lines 2536 (4) and 2619 (5) from two elbows (6).
(3)
Remove air line 2008 (7) from elbow (8).
|