| |
TM 9-2320-364-20-4
12-134
Materials/Parts
Sealing Compound (Item 77, Appendix C)
This task covers:
a. Removal
c. Installation
d. Follow-On Maintenance
b. Cleaning/Inspection
INITIAL SETUP
Personnel Required
Two
Equipment Condition
Engine OFF, (TM 9-2320-364-10)
Wheels chocked, (TM 9-2320-364-10)
Air system drained, (TM 9-2320-364-10)
Tools and Special Tools
Tool Kit, General Mechanics: Automotive
(Item 74, Appendix G)
Cap, Vise Jaw (Item 9, Appendix G)
Vise, Machinists (Item 75, Appendix G)
Wrench, Combination 1-1/16 in.
(Item 78, Appendix G)
Wrench, Combination 1-1/8 in.
(Item 79, Appendix G)
Wrench, Combination 1-3/8 in.
(Item 82, Appendix G)
12-29. AIR RESERVOIR NO. 3 REPLACEMENT.
Materials/Parts - Continued
Tags, Identification (Item 88, Appendix C)
Locknut (4) (Item 91, Appendix F)
Locknut (2) (Item 140, Appendix F)
Lockwasher (4) (Item 168, Appendix F)
NOTE
Tag and mark air lines prior to removal.
(1)
Remove air line 2007 (1) from elbow (2).
(2)
Remove air line 2895 (3) from elbow (4).
(3)
Remove air line 2621 (5) from elbow (6).
(4)
Remove air lines 2011 (7) and 2014 (8) from two elbows (9).
|