Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-4      4-91 (4) Route ether tube (1) through two engine wire harness clips (5). NOTE Install cable ties as required. (5) Cut ether tube (1) to correct length. (6) Position nut (3) and ferrule (4) on ether tube (1). (7) Install ether tube (1) on valve assembly (2). c. Follow-On Maintenance: Connect ether start aid assembly, (Para 4-18). Install right side noise panel, (Para 17-26). Install left side noise panel, (Para 17-28). Start engine, (TM 9-2320-364-10). Shut OFF engine, (TM 9-2320-364-10). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business