| |
TM 9-2320-364-20-4
7-295
e.
Installation.
(1)
Position battery box (2) on truck.
(2)
Position wire 1139 (15) in battery box (2).
(3)
Install two wires 1138 (13) and 1828 (14), lockwashers (12), washers (11) and screws (10) on shunt (9).
(4)
Install wire 1829 (8), lockwasher (7) and screw (6) on shunt (9).
(5)
Install battery box (2) four screws (3),
washers (4) and locknuts (5) on truck.
(6)
Install wiring (1) through center hole in
battery box (2).
f.
Follow-On Maintenance:
Install batteries, (Para 7-88).
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
|